Previously:
PART 18: A NEW TILLER
Here are some progress photos of the project to date:
Stern rail repair:
|
Trying to jack out bent pushpit. |
|
Damaged section removed. |
|
Bending new section for repair.
|
|
Sleeved joint. |
|
New section fitted ... |
|
... and professionally welded. |
Work on the dodger (spray hood) has started. Sunbrella material and stainless pipe and fittings have been ordered.
|
Frame pattern bent up from 3/4" EMT
|
|
Craft paper cover taped on. |
|
Front view, with windows sketched in.
|
Paint work on the decks and cockpit was divided into four sections:
- cockpit
- main cabin top
- port side decks and cabin side
- starboard side decks and cabin side
Each section was masked off separately, painted with three coats of System Three WR-LPU water-born paint, then covered over to protect from over-spray from the next area.
Although a lot of extra masking was done, it was easier to keep a "wet edge" when painting, and kept over-spray off areas already painted. It also helped to avoid stepping in the wet paint!
|
Port side painted. |
|
Port side of decks done. |
|
New paint on smooth areas. |
|
Non-skid masking. |
|
Non-skid painted a contrasting colour. |
Next comes bolting on all the hardware that was cleaned up and re-built over the winter. It's a joy to see her start looking like a boat again, as the basement slowly empties of all the boat pieces.
Next:
PART 20: LAUNCH DAY
No comments:
Post a Comment