Monday, June 25, 2012

One Year in Restoration, the Boat Rescue.

Previous Post: Part 10: Interior Work Starts in Ernest.
Just a note in passing, today marks exactly one year since we pulled the Ballad home. At times things seem to be going pretty slow, but looking back at the early pictures I realize just how far we've come.

Then ...

Friday, June 8, 2012

BOAT RESCUE PART 10: INTERIOR WORK STARTS IN ERNEST

Previous Post: BOAT RESCUE PART 9: THE FUN CONTINUES.

It seems as though progress has been slow, but checking my photo files I realize this is not the case. Several  non-boat related projects have been completed, freeing me up to concentrate on the Ballad again.

The damage around the table supports in the cockpit floor greeted me every time I climbed into the boat, so it was time to attend to that job.


Leaking damaged area around table leg sleeve.
I cut out the damaged areas around both sockets and filled them with epoxy-soaked plugs, adding a layer of epoxy to fill them back to original floor level.

Epoxy/plywood plug.
A reinforcing piece was added below to strengthen the repair, and allow leg sockets to be added, if needed, in the future.

Epoxy/plywood reinforcement patch, curing with a little help from a heat lamp.